This guide offers concise, step‑by‑step instructions for installing and maintaining a modern condensing boiler, covering safety checks, wiring, and commissioning. Designed for installers and homeowners alike, it ensures reliable, efficient operation and compliance with current regulations. 2026

Purpose of the Manual
The Glow Worm Flexicom 30CX manual serves as the definitive guide for qualified installers, maintenance staff, and informed homeowners. It delivers concise, step‑by‑step instructions that cover safe installation, commissioning, and routine servicing of the condensing boiler. By following the manual, users ensure compliance with statutory regulations, achieve peak efficiency, and maintain reliable heating and hot water supply. The document also offers troubleshooting guidance, diagnostic procedures, and corrective actions for common faults, thereby reducing downtime and service costs. Additionally, it outlines preventive maintenance schedules and safety checks that extend the boiler’s service life and protect occupants from potential hazards. In essence, the manual empowers users to manage the Flexicom 30CX confidently, guaranteeing regulatory compliance and customer satisfaction.
Beyond installation, the manual details operational guidelines that maximize energy savings and prolong component longevity. It explains how to adjust boiler settings for optimal performance, manage water pressure, and monitor combustion efficiency. The manual also includes a section on emergency procedures, outlining steps to safely shut down the unit during faults or fire risks. Regular updates reflect changes in regulations, technology, and best practices, ensuring users always have the most current information. By adhering to these guidelines, installers avoid costly mistakes, while homeowners enjoy peace of mind knowing their heating system operates safely, efficiently, and at peak performance.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.!

Model Overview
Glow Worm Flexicom 30CX is a 30 kW condensing boiler designed for domestic heating and hot water. It features a compact, stainless‑steel cabinet, dual‑stage combustion, and a 10‑year warranty. The unit offers high efficiency, low emissions, and intuitive controls for optimal performance. Ideal for homes.OK!

Glow Worm Flexicom 30CX Features
Key attributes of the Flexicom 30CX include:
- 30 kW condensing boiler with 10 % higher efficiency than the 29 kW model.
- Compact, stainless‑steel cabinet (450 mm × 300 mm × 200 mm) for tight spaces.
- Dual‑stage combustion for precise temperature control.
- Integrated 3‑way valve for simultaneous heating and domestic hot water.
- Low‑noise operation (≤ 55 dB) and vibration‑damping mount.
- Built‑in safety sensors: flame failure, over‑pressure, high‑temperature cut‑off.
- Digital display with programmable timers and fault codes.
- Optional remote control via Wi‑Fi module (compatible with Glow Worm app).
- 10‑year warranty on the boiler and 5‑year on the cabinet.
- Compliance with UK Part B and Part C safety standards.
In addition to the core specifications, the Flexicom 30CX incorporates advanced diagnostics that log fault codes to the digital display, enabling quick troubleshooting. The boiler’s low‑pressure cut‑off protects the system during supply interruptions, while the integrated 3‑way valve delivers simultaneous domestic hot water and heating. Its compact footprint and vibration‑damping design make it suitable for small apartments or retrofit projects. The unit’s 10‑year warranty covers all major components, ensuring for the homeowner peace mind

Installation Requirements
Ensure a 230 V circuit, 10 A breaker, and a 1.5 mm² supply cable. Verify the boiler cabinet fits the 450 mm × 300 mm × 200 mm footprint. Check gas pressure (≤ 0.6 bar) and water supply (≤ 1.5 bar). Install a 1 m³ water tank and secure the unit on a base firmly.

Pre-Installation Checks
Before mounting the Glow Worm Flexicom 30CX, verify the following items to guarantee safe and compliant installation. 1. Electrical: Confirm a dedicated 230 V, 10 A circuit with a residual‑current device (RCD). The supply cable should be 1.5 mm², insulated and correctly terminated at the boiler’s terminal block. 2. Gas: The mains gas pressure must be within 0.4–0.6 bar, and the line should be free of leaks; perform a pressure test and use a calibrated gas leak detector. 3. Water: Supply water pressure should not exceed 1.5 bar; install a pressure relief valve (PRV) set at 1.5 bar. 4. Ventilation: Ensure the boiler is placed in a well‑ventilated area, with a minimum clearance of 200 mm on all sides, and that the flue system is correctly sized and installed according to the manufacturer’s diagram. 5. Safety: Verify that the boiler’s safety interlocks, such as the high‑temperature cut‑off and the flame failure device, are intact and functional. 6. Documentation: Keep the boiler’s serial number, model, and installation manual handy for reference during commissioning. 7. Site preparation: Confirm that the floor is level and the mounting base can support the unit’s weight (approximately 70 kg). 8. Compliance: Check that all local regulations and the manufacturer’s guidelines are met, including any required permits or inspections. Completing these checks reduces the risk of operational faults and ensures the boiler will run efficiently and safely once commissioned. After confirming all parameters, document the results in a logbook and schedule the commissioning test within 48 hours. This proactive approach helps maintain warranty coverage and facilitates future maintenance. The installation team should also verify that the boiler’s mounting brackets are properly secured to a concrete or steel base, and that the unit’s tilt is within the manufacturer’s tolerance to prevent water ingress. Additionally, a pre‑commissioning safety audit should be performed by a qualified gas engineer to certify compliance with the latest safety standards. Once all checks are completed, the installer should perform a dry run of the control panel, ensuring all indicators light correctly, and then proceed to the first hot water cycle to confirm proper operation. Finally, the installer should record all measurements and observations in the service log, ensuring traceability for future maintenance.

Installation Steps
Mount the unit on a level base, connect gas, water, and electrical supply per diagram. Secure flue, test for leaks, then power on. Run a dry cycle, check pressure, temperature, and flame. Log all readings and seal the cover Tighten all fittings and confirm water press
Step-by-Step Installation Procedure
Prepare the installation site by ensuring a surface and clearance for boiler. Now and check Verify that the gas supply line, water pipe, and electrical connection points are within reach and comply with local regulations. 2. Mount the boiler on the prepared base using the supplied mounting brackets, tightening all bolts securely to prevent vibration. 3. Connect the gas inlet to the mains gas supply, ensuring the correct pressure rating and using a pressure gauge to monitor flow. 4. Attach the water supply pipe to the boiler inlet, sealing all fittings with appropriate gasket material and torqueing to manufacturer specifications. 5. Wire the electrical supply: connect the 240 V supply to the boiler’s power terminals, using a dedicated circuit breaker and ensuring proper grounding. 6. Install the flue system according to the schematic, ensuring a clear path for exhaust gases and securing all joints with high‑temperature sealant. 7. Perform a leak test on gas and water connections using a soapy water solution; any bubbles indicate a leak that must be tightened. 8. Close the boiler cover and secure it with the supplied lock. 9. Power on the boiler and run a dry cycle to purge the system of air. 10. Check the boiler pressure gauge; it should read between 1.0 bar and 1.5 bar. 11. Verify the flame colour and intensity; a stable blue flame indicates correct combustion. 12. Set the thermostat to the desired temperature and allow the boiler to cycle normally.

Operation Guidelines
Operate the boiler only after a full safety check. Set the thermostat to the desired temperature, monitor the pressure gauge, and ensure the flame remains blue. Turn off the boiler when not in use, and keep the area clear of flammable materials. Check pressure. now.
Using the Boiler Safely and Efficiently
Before you start, ensure the boiler is correctly wired, the gas supply is secure, and the ventilation system is clear. Set the thermostat to the desired temperature; the recommended range is 18–21 °C for domestic use. Keep the pressure gauge between 1.0 and 1.5 bar; if it falls below 0.8 bar, add water via the filling loop. The flame should be steady blue; a yellow or flickering flame indicates a problem and requires immediate inspection. Turn the boiler off when the house is unoccupied or during maintenance. Use a timer or smart thermostat to avoid overheating. Check the condensate drain for blockages regularly; a clogged drain can cause the boiler to shut down. Inspect the heat exchanger for corrosion or scale; if you notice any, schedule professional servicing. Keep the surrounding area free of combustible materials and ensure the room is well‑ventilated. For energy efficiency, install a low‑flow showerhead and use a programmable thermostat to match heating patterns to your daily routine. Finally, read the manufacturer’s safety warnings and follow the emergency shutdown procedure if you detect a gas leak or unusual noise. Regularly review the boiler’s operating manual for updates and maintain a log of all service dates and observations. This proactive approach ensures safe, efficient operation and prolongs the boiler’s lifespan. Always keep a log of all service dates, pressure readings, and any unusual observations to aid future diagnostics promptly.

Maintenance & Servicing
Schedule annual checks: clean the heat exchanger, inspect the condensate drain, verify pressure, test the safety valve, and replace filters. Follow Glow‑Worm’s service guide, use the front‑cover phone number for certified help, and log all work for warranty compliance
Recommended Maintenance Schedule
Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Maintain the boiler by following these steps: Check. test.!!

Safety & Troubleshooting
Ensure the boiler is switched off and cooled before any inspection. Check for gas leaks, carbon monoxide, and water pressure. If the boiler fails to ignite, inspect the flame sensor, check the gas supply, and verify the pressure gauge. Contact a qualified technician if problems persist. Check up.
Common Issues and Fixes
When the Flexicom 30CX fails to start or runs erratically, common faults include low pressure, a faulty flame sensor, thermostat mis‑set, blocked condensate drain, and a stuck pressure relief valve. Quick checks can often resolve these issues.
- Low water pressure: Check gauge; top up with distilled water via filling loop. Purge air to raise pressure.
- Flame sensor: Clean with soft brush or solvent. Replace if unresponsive.
- Thermostat: Verify set point and wiring. Reset if fault code appears.
- Condensate drain: Inspect for kinks or debris. Clear and flush with detergent.
- Pressure relief: Tap valve to free. Replace if leakage continues.
In addition, check for error codes displayed on the boiler’s LCD panel. Refer to the model’s troubleshooting table for code meanings and recommended actions. If the boiler continues to exhibit abnormal behaviour after these checks, schedule a professional service call. Regular maintenance and prompt attention to warning signs will extend the life of the unit and maintain efficient operation.
Always keep the boiler’s manual handy and review the safety instructions before each service. If you notice any unusual noises, smells, or performance drops, stop the boiler immediately and seek professional help. Regularly inspecting the venting system and ensuring adequate ventilation will prevent carbon monoxide buildup and maintain safe operation.
Keep manual handy! ok